Feature 01
Exact-model configuration: 8+1 standard configuration


A modular portable vehicle stopper for temporary checkpoints and restricted vehicle access. The standard 8+1 arrangement combines eight barrier modules with one controller and supports project-defined module quantities.
Product features
Source-supported characteristics for model selection and technical discussion.
Feature 01
Exact-model configuration: 8+1 standard configuration
Feature 02
Modular 8+1 arrangement with eight barrier modules and one controller
Feature 03
Customisable module quantity
Feature 04
Documented 560 mm module pitch
Feature 05
Portable layout for temporary checkpoint deployment
NX-RB-PT01 - structured technical parameters for engineering evaluation, RFQ clarification and tender documentation.
Engineering data sheet
Source specifications are retained as published. Verification notes identify what an engineer should confirm against drawings, system architecture and the final quotation before purchase order.
| Parameter | Specified value | Unit / standard | Engineering verification |
|---|---|---|---|
| NexPro model | NX-RB-PT01 | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Product family | Portable Vehicle Stoppers | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Configuration | 8+1 standard configuration | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Source evidence | Supplier catalog physical page 15 | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Parameter scope | Variant-specific where explicitly separated; otherwise series-level published data | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Parameter | Specified value | Unit / standard | Engineering verification |
|---|---|---|---|
| Standard configuration | 8+1: eight barrier modules plus controller; module count customisable | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Module pitch | 560 mm | mm | Confirm the current model revision in the final technical submittal before purchase order. |
| Power | 350 W | W | Confirm input supply, polarity and backup sizing against the project electrical design. |
| Module dimensions | 560 mm±2 mm x 1087 mm x ±5 mm x 871 mm±2 mm (excluding wheels) | mm | Verify against the approved drawing, opening direction and installation conditions. |
| Assembled dimensions | 4230 mm±20 mm (L) x 1087 mm±5 mm (W) x 871 mm±2 mm (H (excluding wheels)) | mm | Verify against the approved drawing, opening direction and installation conditions. |
| Parameter | Specified value | Unit / standard | Engineering verification |
|---|---|---|---|
| Supply voltage | DC 24 V | V | Confirm input supply, polarity and backup sizing against the project electrical design. |
| Remote-control distance | 20M | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Module weight | 16.5 kg±1 kg | kg | Verify against the approved drawing, opening direction and installation conditions. |
| Material | Carbon steel | — | Confirm the current model revision in the final technical submittal before purchase order. |
| Parameter | Specified value | Unit / standard | Engineering verification |
|---|---|---|---|
| Model | NX-RB-PT01 | SKU | Use the exact model code on drawings, BOQ, quotation and purchase order. |
| Product family | security-inspection-perimeter | Category | Confirm the selected family matches the complete system architecture. |
| Typical applications | Temporary checkpoints, Event security, Vehicle access control | Application | Validate suitability against the actual site workflow and environment. |
| MOQ | Confirm by model, quantity and configuration | Order | Confirm by final model mix, finish and customization scope. |
| Lead time | Confirm after technical scope review | Schedule | Reconfirm after sample approval and before project delivery planning. |
| FOB port | China main ports | Incoterm | Confirm Incoterm, destination and consolidation plan in the quotation. |
| OEM / ODM | Available | Supply | Confirm logo, finish, packaging, labels, manuals and firmware scope where applicable. |
| RFQ confirmation | Confirm site dimensions, operating environment and control interfaces before order. | Project | Include this item in the technical clarification record. |
| RFQ confirmation | Series-level published data must be reconfirmed for the selected exact configuration. | Project | Include this item in the technical clarification record. |
| RFQ confirmation | Final compliance, impact, detection and range claims require approved project submittal evidence. | Project | Include this item in the technical clarification record. |
Engineering note: Website data supports preliminary selection and RFQ preparation. Final voltage, interfaces, drawings, dimensions, environmental rating, accessories and firmware revision must be confirmed in the approved technical submittal.
Move from the website record to a controlled technical clarification, exact configuration and commercial quotation without assuming unconfirmed certifications or performance data.
Compare source-bound product images and adjacent configurations from the same documented series before widening the selection.
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEM
Source catalog modelOEMSource-controlled answers for model selection and RFQ preparation.
Provide the exact model, quantity, site layout, power, interfaces, environmental conditions and destination.
They support preliminary selection. Final values are confirmed in the approved project technical submittal.
Send your project requirements or BOM list. The team reviews the selected model, quantity, destination and customization scope, then confirms quotation timing.
Send your model list, quantity and destination for a reviewed quotation.
Start RFQFull technical specs, dimensions and available model-level documents for tender prep.
Request DatasheetSend your preferred time and discussion scope for a technical call request.
Request Call