Rack and equipment
Confirm cabinet type, mounting orientation, available rack space, equipment list and cable direction.
Input supply
Confirm destination voltage system, rated current, input method, plug and required cable length.
Outlet schedule
Match outlet standard, quantity and row layout to the connected equipment and rack elevation.
Protection
Review switching, surge, breaker and overload functions from the load and operating risk.
Metering and control
Define local display, remote monitoring, network, cascade and environmental sensor scope.
Submittal and supply
Confirm model identifiers, labels, mounting, quantity, packing and project documentation.